
Residential · Fleet, Hampshire
Current projectFleet loft conversion
External soil, vent and waste pipework installed for a new loft bathroom.

Project overview
The pipework has been carefully routed around the new roof layout, allowing the loft bathroom to connect into the property’s drainage system while keeping future access and weathering in mind.
Delivery report
How the project was delivered.
A clear record of the brief, our approach and the standard of work carried through the installation.
The requirement
Provide new drainage and ventilation for a loft bathroom while working around the altered roof, gutter and external elevations.
Route planning
The route was assessed to create suitable falls, reliable connections and a neat external appearance without obstructing roof details or future maintenance.
Installation
New soil, vent and waste pipework was securely clipped and connected to serve the new sanitaryware, with external joints and offsets kept controlled.
Next stage
The drainage is prepared for the remaining bathroom installation and will be checked as the loft fit-out progresses.


Planning similar work?
Bring us in early.
Send the drawings, location and proposed programme. We can review the plumbing requirements and advise the next step.